- Province
- Sevilla
- Basin
- Guadalquivir
- River
- Viar
- Dam
- Gravity · 2009
83.3%
Current level
155 hm³
Stored water
186 hm³
Total capacity
-2.0 hm³
Weekly change
+5.0 hm³
Vs. 2025
+19.0 hm³
Vs. 10-year mean
hm³
Technical data
Characteristics of the dam and its recorded uses.
Characteristics
- Municipality
- Castilblanco de los Arroyos, El Pedroso
- River
- Viar
- Dam type
- Gravity
- Year built
- 2009
- Surface area
- 1,460 ha
- Upstream
- El Pintado
- Downstream
- No
Recorded uses
- Water supply
- Irrigation
- Swimming
Not recorded: electricity, industrial, fishing, boating, picnic, restaurants.
Source: MITECO Inventory of Dams and Reservoirs.